Feeds:
Posts
Comments

Archive for August, 2008

Well, the windows STILL haven’t arrived, but we won’t freeze this winter, as the woodburner has been installed – I love the way the slate surround has worked out.

A roaring fire will make a good focal point at the end of the long central hall between the two carriages – we’re waiting for an electrician [...]

Read Full Post »

If a week is a long time in politics, two weeks is an absolute age in a building project at this stage. In the fortnight since my last visit, John and co have made fantastic progress. Most exciting is that the ceilings in the hall between the two railway carriages have been lined in matchboarding [...]

Read Full Post »

The new front doors and windows have been put in, and look very smart from both the outside -

just look at the beautiful curve of that new roof! – and inside -

The fact that these were made up by our builder just from a rough sketch by me just proves how wonderful he is. [...]

Read Full Post »